Topic: Construction

31 chapters across the catalog

Jeff Davis At Mount Carmel Church In Waco   Site Of The 1993 Siege Of The Branch Davidians [v9C1 GsNdns]
0:58 - 2:04

Jeff Davis At Mount Carmel Church In Waco Site Of The 1993 Siege Of The Branch Davidians [v9C1 GsNdns]

Trans-Texas Corridor Construction Plans Over Mount Carmel Site

Surveyors in McLennan County have reportedly mapped the Trans-Texas Corridor to run directly through the Mount Carmel church site. Stuart Nelson claims the southbound fast lane is designed to roll over the memorial chapel. Maps of the project are allegedly no longer being released to the public by county officials.

The Phoenix Project: Rebuilding The Branch Davidian Church (Day One) Sept. 19, 1999 [ESeM8Ppom60]
10:26 - 13:13

The Phoenix Project: Rebuilding The Branch Davidian Church (Day One) Sept. 19, 1999 [ESeM8Ppom60]

Mount Carmel Construction Logistics, Foundation Pouring and Material Donations

Construction at the Mount Carmel site progressed as volunteers surveyed the land and prepared to pour the concrete foundation for the new sanctuary. Organizers estimate the superstructure will be completed within three months, providing a functional space for surviving Davidians like Clive Doyle and David Thibodeau. The project relies entirely on donated time, labor, and materials from citizens across Central Texas who oppose the government's historical narrative of the siege.

The Phoenix Project: Rebuilding The Branch Davidian Church (Day One) Sept. 19, 1999 [ESeM8Ppom60]
18:27 - 21:16

The Phoenix Project: Rebuilding The Branch Davidian Church (Day One) Sept. 19, 1999 [ESeM8Ppom60]

Mount Carmel Site Activity, Interaction with Survivors and Workers

Volunteers at the Mount Carmel site interacted with survivors, including a woman referred to as Miss Catherine, while managing the physical demands of the build. Workers like Steve Lane assisted with cutting steel and tying reinforcements in the heat. The atmosphere on-site included discussions of historical artifacts found in the rubble and the documentation of the process via digital photography for online distribution.

Davy Crockett Courts To Open In January In Gonzales Texas [nmYKO G Kko]
7:07 - 9:53

Davy Crockett Courts To Open In January In Gonzales Texas [nmYKO G Kko]

Motel Expansion and St. George Storage Project

Renovations are underway at the motel property on Highway 183, including the construction of a new porch and a small bar area. Plans for the site include the opening of St. George, a facility for self-storage and outdoor RV and boat parking, scheduled for January. One of the four houses on the property is being converted into two additional motel rooms.

24 Year Anniversary Of Waco Massacre Updating [6KiB3xgCWBU]
1:30 - 2:46

24 Year Anniversary Of Waco Massacre Updating [6KiB3xgCWBU]

Mount Carmel Church Reconstruction and Tornado Damage

A commemorative church was built at the Mount Carmel site starting in September 1999 and dedicated on April 19, 2000. Despite a recent tornado strike, the structure remains a focal point for survivors and supporters. The timeline marks 17 years since the building's completion and 24 years since the original Waco siege events.

Jeff Davis(Classic 1997) With Jimmy Ritter(Killer At The Border) [7GR6hr TfQs]
0:00 - 5:06

Jeff Davis(Classic 1997) With Jimmy Ritter(Killer At The Border) [7GR6hr TfQs]

Federal Reserve, Constructive Fraud, and Indentured Servitude

Jeff Davis introduces the program with a critique of the Federal Reserve, characterizing it as a private corporation operating for profit rather than a government entity. The segment features a musical montage and spoken word performance regarding "constructive fraud," statutory slavery, and the transition of the American public into "indentured servitudial slaves." The lyrics specifically target the Federal Reserve Act, the IRS, and the implementation of social security as tools of financial enslavement.

Fire Survivor, Clive Doyle, Interview [Alex Jones Mike Hanson Mt. Carmel Feb. 20, 2000] [bV6k3FYjaHM]
0:00 - 2:13

Fire Survivor, Clive Doyle, Interview [Alex Jones Mike Hanson Mt. Carmel Feb. 20, 2000] [bV6k3FYjaHM]

Construction Progress at the Mount Carmel Center Site

The speakers discuss ongoing construction and maintenance at a site that resembles Noah's Ark, specifically mentioning painting and caulking tasks scheduled for the following week. They dismiss rumors about a drug lab while referencing the difficulty of keeping information online due to potential viruses.

Raw⧸Uncut Footage Rebuilding Of Mt. Carmel Church(Branch Davidian)(March 25, 2000) Jeff Davis Int. [IwyjV0MR5c4]
5:45 - 15:34

Raw⧸Uncut Footage Rebuilding Of Mt. Carmel Church(Branch Davidian)(March 25, 2000) Jeff Davis Int. [IwyjV0MR5c4]

Interior Construction and Sheetrock Installation at Mount Carmel

Volunteers at the Mount Carmel site transition from exterior work to interior finishing, including taping and floating sheetrock. The crew discusses the technical aspects of the build while managing camera equipment and lighting for the documentary footage. Despite the small visible crowd, the workers emphasize the progress made on the chapel's physical structure.

Raw Footage 1999 Of Patriots Rebuilding Church For Survivors [KJmVLHSo11o]
4:07 - 20:50

Raw Footage 1999 Of Patriots Rebuilding Church For Survivors [KJmVLHSo11o]

Construction Progress and Siding Installation at the New Sanctuary

Workers and volunteers coordinate the installation of siding and windows on the second floor of a new church building. The group discusses technical aspects of the build, including the use of nail guns, 2x4 lumber, and the placement of small pieces to catch the front of the structure. One individual mentions running for office against current incumbents during a break in the labor.

Raw Footage 1999 Of Patriots Rebuilding Church For Survivors [KJmVLHSo11o]
21:04 - 22:51

Raw Footage 1999 Of Patriots Rebuilding Church For Survivors [KJmVLHSo11o]

Witness Account of Helicopter Assault on David Koresh's Bedroom

A witness describes seeing helicopters approaching the Mount Carmel Center in a V-formation during the 1993 siege. The account details how gunfire was directed specifically at David Koresh's bedroom, a detail the speaker claims was omitted from mainstream television coverage. The conversation shifts to the funding of the new church project, which is reportedly fully paid for through contributions.

Raw Footage 1999 Of Patriots Rebuilding Church For Survivors [KJmVLHSo11o]
23:10 - 30:31

Raw Footage 1999 Of Patriots Rebuilding Church For Survivors [KJmVLHSo11o]

Site Safety and Reflections on the Waco Fire Footage

Construction continues at the Waco site as workers manage safety around the second-floor installation. A speaker references a copy of footage sent by McNulty three weeks prior, which allegedly depicts the start of the fire at the compound. The dialogue touches on learning from past mistakes and turning the memory of the event into a form of vengeance.

Raw Footage 1999 Of Patriots Rebuilding Church For Survivors [KJmVLHSo11o]
55:03 - 57:39

Raw Footage 1999 Of Patriots Rebuilding Church For Survivors [KJmVLHSo11o]

Interior Finishing and Sandhill Crane Sightings

The construction crew evaluates the progress of the building, noting that 60% of the work involves time-consuming interior details. While discussing the upcoming painting and caulking, the group spots a large bird in flight, identified as a Sandhill Crane. The conversation briefly covers the taste of the bird and the legal requirements for hunting licenses and permits.

Raw Footage 1999 Of Patriots Rebuilding Church For Survivors [KJmVLHSo11o]
57:39 - 1:01:23

Raw Footage 1999 Of Patriots Rebuilding Church For Survivors [KJmVLHSo11o]

Siding Alignment and Scaffolding Logistics

Workers discuss the technical alignment of the siding to prevent rain from entering the attic through the slots. There is an urgent request for a builder named Steve to install stairs the following week, as the current scaffolding will become unusable once the siding is completed. The segment ends with the crew wrapping up for the day as the temperature drops.

Raw Footage 1999 Of Patriots Rebuilding Church For Survivors [KJmVLHSo11o]
1:03:01 - 1:13:59

Raw Footage 1999 Of Patriots Rebuilding Church For Survivors [KJmVLHSo11o]

Final Measurements and End of the Work Day

The crew performs final measurements for the door and bridge cap, using specific indices like "111" and "115 and a half." They coordinate the return of ladders and mark the wood for the next phase of construction. The segment concludes with the workers saying goodnight as they finish their tasks for the day.

Raw Footage 1999 Of Patriots Rebuilding Church For Survivors [KJmVLHSo11o]
1:15:47 - 1:28:56

Raw Footage 1999 Of Patriots Rebuilding Church For Survivors [KJmVLHSo11o]

Window Trim and Self-Defense Commentary

The group discusses the installation of 3.5-inch trim on the windows and the upcoming painting schedule. A television is set up to watch Fox News, and the conversation takes a dark turn with a comment about an individual's actions being "self-defense" regarding a self-inflicted injury. The crew continues to joke and interact while managing their remaining supplies.

Raw Footage 1999 Of Patriots Rebuilding Church For Survivors [KJmVLHSo11o]
1:36:06 - 1:46:27

Raw Footage 1999 Of Patriots Rebuilding Church For Survivors [KJmVLHSo11o]

Stair Construction and Media Production Logistics

The crew discusses the construction of a new set of stairs and the availability of 2x6 lumber. Interspersed with the building talk is a discussion about media production, including the use of a steady cam and a critique of a show's advertising. A reference is made to a "TIT-TAC from West Virginia" who was expected to appear but was last heard of in Nashville.

Jeff Davis And Alex Jones Random Raw Clips [uiEr OrjzP8]
1:41:28 - 1:46:07

Jeff Davis And Alex Jones Random Raw Clips [uiEr OrjzP8]

Federal Reserve, Constructive Fraud and Income Tax

The program examines the legal status of the Federal Reserve, asserting it is a private corporation owned by stockholders rather than a government agency. The term "constructive fraud" is introduced to describe the U.S. monetary system and the implementation of the income tax. Musical lyrics describe citizens as "indentured servitudal slaves" who are being taxed into their graves by "international gangsters" and a deceptive educational system.

Jeff Davis And Alex Jones Random Raw Clips [uiEr OrjzP8]
1:56:58 - 2:07:25

Jeff Davis And Alex Jones Random Raw Clips [uiEr OrjzP8]

Final Summary, Federal Reserve and New World Order

The program concludes by reiterating that the Federal Reserve is a private entity listed in the business white pages rather than government listings. The hosts repeat the concept of "constructive fraud" and play a final musical montage regarding tax resistance and gun rights. The show ends with a final endorsement of the Mike Hanson Archives and a vocal rejection of the New World Order in favor of the Republic.

Jeff Davis Show Classic November 3 1997 Army Merges W Civilian Police [FPGXx73eBT4]
0:00 - 5:47

Jeff Davis Show Classic November 3 1997 Army Merges W Civilian Police [FPGXx73eBT4]

Jeff Davis and Mike Hanson, Constructive Fraud and Tax Slavery

Jeff Davis and Mike Hanson introduce a retrospective look at 1990s public access television content focused on government conspiracy and financial tyranny. The segment features a musical performance and spoken word piece regarding the Federal Reserve being a private corporation and the concept of constructive fraud. The lyrics characterize the American tax system as a form of statutory slavery and indentured servitude orchestrated by international bankers.